𝑺𝑬𝑡𝑰𝑢𝑹 π€π‘π‚π‡πˆπ“π„π‚π“π’ 𝐍𝐄𝐄𝐃𝐄𝐃 π€π‘π€πŒπ‚πŽ π–πŽπ‘πŠπ’π‡πŽπ π‹πŽππƒπŽπ

𝑺𝑬𝑡𝑰𝑢𝑹 π€π‘π‚π‡πˆπ“π„π‚π“π’ 𝐍𝐄𝐄𝐃𝐄𝐃 π€π‘π€πŒπ‚πŽ π–πŽπ‘πŠπ’π‡πŽπ π‹πŽππƒπŽπ 2023

Interview Location: London

Work Location: Saudi Arabia


πŒπˆππˆπŒπ”πŒ π‘π„ππ”πˆπ‘π„πŒπ„ππ“π’:
β€’ 15 years’ design experience in an architectural office.
β€’ Architectural Registration US or UK
β€’ Member of the AIA or RIBA
β€’ Excellent command of the English language
𝑺𝒉𝒐𝒖𝒍𝒅 𝒉𝒂𝒗𝒆 𝒂 π’‘π’π’“π’•π’‡π’π’π’Šπ’ 𝒐𝒇 π’˜π’π’“π’Œ 𝒕𝒐 π’”π’‰π’π’˜.


ππŽπ’πˆπ“πˆπŽπ πƒπ„π’π‚π‘πˆππ“πˆπŽπ:
1. Receiving Work Requests
Once the work request from the Work Control Group is received, the designer has to schedule the start and end date of the project in coordination with Engineering Support Group. Most of the time she/he will receive more than one job; the designer is to manage time and resources for priority jobs while not delaying planned projects.
2. Identifying Project Service Request
There are generally two types of projects: Planned; projects that as allocated funds during the year. Unplanned: Does not have allocated funds, but is requested as a priority from UpperManagement without any prior planning; like: Executive Houses, quick responses. Consult with Work Control.
3. Listing Proponent Requirements
Understanding the Proponent’s Requirements: (functions, activities, preferences, budget, timeline, priorities)
4. Studying Existing
Requesting security approvals: Fill up a form prior to visiting facility and taking pictures Filing existing pictures.
5. Concept Design
Developing a concept design in free hand, 2D, or 3D CADD presentations including main ideas
6. Budgetary Estimate
Study budgetary estimates that fit the proponent’s requirements.
7. Concept Presentations
Preparing presentations; hardcopies on boards or digital presentations on Power Point .Giving verbal presentation to the Documenting minutes of meeting and developing design
options and estimates.
8. Engineering Package Coordination
Once design is approved the designer works closely with an assigned Architect at the Engineering Group or with the Interior Design in house Architect to develop the engineering
package. Drawings and Scope of Work.
9. Materials’ Specification
Selection and specification of interior and exterior finishes and lighting fixtures. Including selection and specification of furniture, accessories, and signage.
10.Role: Proponent Representative on Mega Projects
General: Reviewing design, materials, and finishes with Design Consultants by physical or virtual reviews.
Description:
β€’ Reviewing hardcopy, softcopy and e-review submittals by text comments, PDF comments, hand sketches, or technical drawings and illustrations.
β€’ Verbal comments in Web-X meetings
β€’ Taking minutes of Web-X meetings and distributions
β€’ Traveling to outside consultants office and reviewing their work in workshops